< User:Jakel181‎ | Guides

To update the SDS:

  1. Edit Scratch Design Studio/Current Studio as follows (note: don't blindly replace!):
    1. Replace the Studio ID=... part with Studio ID=(new studio's ID)
    2. Replace the Studio Name=... part with Studio Name=(new studio's name)
    3. Replace the Studio Description=... part with Studio Description=(a line from the new studio's description)
  2. Edit Scratch Design Studio/Studios as follows (note: don't blindly replace!):
    1. Replace the <onlyinclude>...</onlyinclude> part with <onlyinclude>(new number of studios)</onlyinclude>
    2. Add the following line to the bottom of the long list:
      # {{../Studio|(new studio's ID)|(new studio's name)|(a line from the new studio's description)|extra=<ref>(any extra information that is worth noting)</ref>}}